Gulfstream Twin Commander 680FL, 680FL(P)
Plane Diagram
FAA requires both sides of the aircraft to be installed at the same time. Sets only sold in pairs for this aircraft.
List Prices
|
|||||||
---|---|---|---|---|---|---|---|
Qty | SMR P/N UTC/BFG P/N | UTC/BFG P/N | Location | Standard Boot | PSA Boot | ||
1 | SMR2015-12-2 | P23S-2015-12-2 | Nac-Brk RH | N/A | N/A | ||
1 | SMR2015-13-1 | P23S-2015-13-1 | Nac-Brk LH | N/A | N/A | ||
1 | SMR2015-14-1 | P23S-2015-14-1 | Horz Stab LH | N/A | N/A | ||
1 | SMR2015-14-2 | P23S-2015-14-2 | Horz Stab RH | N/A | N/A | ||
1 | SMR2015-7-1 | P23S-2015-7-1 | Vertical Fin | N/A | N/A |
Documentation
STC/AML Documentation
Aircraft Flight Manual Supplement
Wing Boot
- 48 hour delivery for Standard Boots and 72 hour delivery for PSA boots in the Continental US and ground shipments to Canada.
- Laboratory proven to last 3 to 5 times longer than competitor's tube type design.
- Same footprint so there are no exposed areas needing backfill or painting.
Aircraft | Gulfstream Twin Commander 680FL, 680FL(P) |
---|---|
Classification | Wing Boot |
Full Description | |
Standard Boot: | |
PSA Boot: | |
BF Goodrich P/N: | |
Safeway P/N: | |
Rapco P/N: | |
Airframe P/N: |