DeHavilland Twin Otter DHC-6 All
Plane Diagram
FAA requires both sides of the aircraft to be installed at the same time. Sets only sold in pairs for this aircraft.
List Prices
|
|||||||
---|---|---|---|---|---|---|---|
Qty | SMR P/N UTC/BFG P/N | UTC/BFG P/N | Location | Standard Boot | PSA Boot | ||
1 | SMR2099-1-1 | P23S-2099-1-1 | Wing LH | N/A | N/A | ||
1 | SMR2099-1-2 | P23S-2099-1-2 | Wing RH | N/A | N/A | ||
2 | SMR1346 | 5E1346 | Engine Inlet | N/A | N/A | ||
1 | SMR2099-50-1 | P23S-2099-50-1 | Horz Stab LH | N/A | N/A | ||
1 | SMR2099-50-2 | P23S-2099-50-2 | Horz Stab RH | N/A | N/A |
Documentation
Aircraft Flight Manual Supplement
Wing Boot
- 48 hour delivery for Standard Boots and 72 hour delivery for PSA boots in the Continental US and ground shipments to Canada.
- Laboratory proven to last 3 to 5 times longer than competitor's tube type design.
- Same footprint so there are no exposed areas needing backfill or painting.
Aircraft | DeHavilland Twin Otter DHC-6 All |
---|---|
Classification | Wing Boot |
Full Description | |
Standard Boot: | |
PSA Boot: | |
BF Goodrich P/N: | |
Safeway P/N: | |
Rapco P/N: | |
Airframe P/N: |