DeHavilland Twin Otter DHC-6 All


Plane Diagram

DeHavilland Twin Otter DHC-6 All

FAA requires both sides of the aircraft to be installed at the same time. Sets only sold in pairs for this aircraft.


FAA STC/PMA Approved De-icers
  Qty UTC/BFG P/N Location  
1 SMR2099-1-1 Wing LH
1 SMR2099-1-2 Wing RH
2 SMR1346 Engine Inlet
1 SMR2099-50-1 Horz Stab LH
1 SMR2099-50-2 Horz Stab RH



Documentation

Aircraft Flight Manual Supplement

Airplane Flight Manual Supplements

Wing Boot

  • 48 hour delivery for Standard Boots and 72 hour delivery for PSA boots in the Continental US and ground shipments to Canada.
  • Laboratory proven to last 3 to 5 times longer than competitor's tube type design.
  • Same footprint so there are no exposed areas needing backfill or painting.
Aircraft DeHavilland Twin Otter DHC-6 All
Classification Wing Boot
Full Description
BF Goodrich P/N:
Safeway P/N:
Rapco P/N:
Airframe P/N: